Building Log Homes
View of the Staked out Lot.
After the foundation has been excavated.
Laying the block
The foundation is in.
The interior slab is done and the walls finished.
The logs have arrive and are ready for unpacking.
The porch framing goes up as windows are put in.
Copyright © 2007 Forest Ridge Log Homes Last modified: 05/12/08 Powered by eProImage Logo by Johnson and Jones (704)718-2171 some images and text used with permission of copyright Tim Munsey Log Homes, Inc. All rights reserved.